[1]
Maldonado, D., Páez, J. and Morillo, M. 2021. Optimization of the 13.8kv “Gobernación” distribution circuit, Coro I substation, Miranda municipality, Falcón state. Ingenium et Potentia. 3, 4 (Jan. 2021), 61–75. DOI:https://doi.org/10.3538/i.p.v3i4.1366.